Compliance Clarity for Architects in the UK

Fast, accredited SAP & energy assessments that keep your designs intact and your deadlines on track.

Tight Deadlines?

We have a prompt turnaround on most reports and urgent work can be accommodated sooner

Design constraints?

We provide solutions that protect your aesthetic intent

Red‑tape risk?

We’ve got a proven track record of first‑time Building Control approval.

How It Works

Send Plans: Upload PDF; receive a scoped quote within 48hrs.

We Model & Advise: SAP, glazing, overheating, water / calcs with revisions included.

You Build: Signed reports delivered; we liaise with Building Control as required.

Our Core Services for Architects in England

  • SAP Calculations – Conversions

    Accredited SAP reports that demonstrate converted buildings comply with regulations, avoiding costly delays at final sign‑off.

  • Energy Statements

    Concise energy statements for planning, quantifying carbon savings and renewable contributions to win local authority approval.

  • Water Efficiency Calculations

    Part G water calculations verifying fittings and flow rates, helping you secure control approval and reduce consumption.

“Green SAP compliance services have always provided a professional and prompt service for all of our thermal performance calculations and Building Regulations submissions”

— Hillmandesign ltd -Chartered Architects

 Our Top Resources

Frequently Asked Questions

  • Contact us as soon as the planning drawings are ready or earlier for advice—typically at RIBA Stage 2–3. Early modelling costs less and prevents late‑stage re‑draws.

  • Send PDF or DWG. In some cases, if you only have concept sketches, we’ll create interim models and update them once detailed drawings are ready.

  • Typically, yes. We run Excessive‑Glazing calculations and TM59 models to prove compliance while preserving your façade vision—often by tweaking glass specs or localising insulation.

  • Fair‑use revisions are included until the scheme reaches compliance and sign‑off. Most projects settle within a few iterations, but we stay on board until completion.

  • We don’t normally liaise directly with Building Control, but we’re happy to do so when needed to assist or respond to technical queries. The wider design team plays a key role in the process, and we actively welcome their input and collaboration.